IVC Screen Crate Installation
April 7, 2004
Photos courtesy Brady Creel
Initial lift of the crate from the truck.
Clearing the truck.
Crate near the building.
Ready to pass through the wall.
From the inside: part way through.
From the inside: nearly there!
From the outside: nearly there!
Covering the opening.
|